Họ tên: Vũ Thanh Hà
Giới tính:
Nam
Ngày sinh:
25/09/1981
Phát triển kỹ năng chuyên môn.
Nâng cao kỹ năng quản lý.
Đóng góp cho sự thành công và phát triển của công ty
Trở thành một nhân viên mẫu mực
Tìm hiểu và nắm bắt công việc từ bạn bè và đồng nghiệp
Hình thức làm việc:
Toàn thời gian cố định
Cấp bậc mong muốn:
Trưởng nhóm/Giám sát
Vị trí mong muốn:
Quan ly/ Giam sat
Resolve the problem in the production
Make the improved to reduce the downtime of machine
Make the project
I. From Sep 2007 to April 2009: work for GCM company(Address :Thuận An District- Binh Duong Province )
1. Job Title: Mechanical Engineers
2. Job description
+ Maintenance and repair
+ Adjust the mold follow as product requested.
+ Directions to operate machinery
+ Perform the repair for all the machine detail follow required
+ Combined with the maintenance team to overhaul the machine
+ Perform the maintenance and replace the mold
+ Make the maintenance plan to replace the mold.
+ Fix all of quality defect if didn't right standard( finish product safety)
+ Fix all of breakdown in the production
+ Maintenance to preventative breakdown
II. From May 2009 to Apr 2011 :work for Kinh Do company (Address: Street No. 8, VSIP, Thuan An District, Binh Duong Province )
1. Job Title: Mechanical engineer
2. Job description
+ Control and adjust the good run setting for product right follow as requested
+ Combined with the maintenance team to overhaul the machine:
• Pre/post meeting for maintenance plan.
• Arrange of work as well.
• Arrange careful to control in the time when maintenance
• Control cost in the maintenance.
• Make the report after maintenance and send out to everyone.
• Record all of issue after maintenance if have and make the action for next to preventative.
+ Perform the repair for all the machine detail follow required.
+ Directions to operate machinery and all of procedure safety before operate machinery
+ Fix all of breakdown in the production
+ Maintenance to preventative breakdown.
+ Installation for new production line:
• Make the installation plan.
• Arrange meeting for each shift to know status of the installation
• Handover all of work for next shift.
• Make the report when have issue
• Arrange work for the team.
• Implement ESH( Environment Safety Health).
+ Trial run for new product:
• Evaluate capacity of machinery with new material
• Make the report for this trial run
III. From Apr 2011 to Apr 2013: work for Kimberly Clack VN(Address: Street No. 32, Dai Lo Huu Nghi Avenue ,VSIP, Thuan An District, Binh Duong Province ).
1. Job Title: Process Engineer
2. Job description
+ Problem solving and preventative breakdown.
• Pre/post meeting for each breakdown
• Record all of issue and make the action for short term and long term.
• Make the master file to control for breakdown, minor stop..
• Make the action for improvement to reduce breakdown, minor stop..
• Make the action to preventative breakdown
+ Prepare all of equipment for changeover and adjust machinery follow as requested
• Change all of module to run with new product
• Change new PLC program to run with new product
• Control quality after changeover
• Make the report if have issue about breakdown.
• Make the action to preventative all of issue maybe back
+ Improve for all equipment on machine to reduce breakdown and change over
+ Improve the machinery and equipment to reduce time for changeover and cost in the maintenance
+ Evaluate the mishap, breakdown the machinery and equipment and make the action to preventative breakdown
+ Make the project on machine to upgrade for new product
+ Combined with the contractor team to order for all of equipment
+ Contact to service company to order the equipment and installation the machinery and equipment follow as requested
+ Adjust the machinery to trial run the new material follow as requested
• Evaluate capacity of machinery with new material
• Make the report for this trial run
+ Make the AM- PM maintenance plan
+ Control in the maintenance
+ Perform the Daily process control( good run setting)
+ Organize meeting to review and perform all of work daily with operate machinery
+ Directions to operate machinery and all of procedure safety before operate machinery
IV. From Apr 2013 until now working for NCI Packaging VN( Address: Street NA2, My Phuoc 2 Industrial Park, Ben Cat District, Binh Duong Province.
1. Job title: Maintenance supervisor
2. Job description:
+ Make the maintenance plan.
+ Manages maintenance budget including monitoring inventory and expenses
+ Supervisor all process the perform in the maintenance proceed.
+ Perform the preventive maintenance for all machinery in the factory.
+ Make the improve to reduce breakdown in the production.
+ Improve the changeover process to reduce the changeover time.
+ Responsible for training employees on equipment, task procedures, work standards and proper safety procedures.
+ Responsible for installation or repair of machinery and equipment.
+ Performs other related tasks and duties as assigned
+ Maintains and updates operating and training manuals for the maintenance department.
Phương pháp luận và sáng tạo
Tam ly hinh hoc
7 Cong cu thong ke
Trình độ tin học:
Tin Hoc A
Tin Hoc B
Auto Cad
Ngoại ngữ:
English - Tiếng Anh
Tốt nghiệp tại trường:
Đại học Cần Thơ
Tốt nghiệp năm:
2007 (Khá)
Ngành học:
Ky su co khi
Trình độ học vấn:
Đại học
Địa điểm làm việc:
Bình Dương
Mức lương:
10 – 15 triệu
Số năm kinh nghiệm:
Hơn 5 năm
Tuổi:
33
Ngành nghề:
Kỹ thuật ứng dụng
Tình trạng hôn nhân:
Đã kết hôn
Ngày làm mới:
12/10/2014